Session Retro — S265 (subo-workflow sub-orchestrator)
Session Retro — S265 (subo-workflow sub-orchestrator)
Section titled “Session Retro — S265 (subo-workflow sub-orchestrator)”Second retro written under the S264-ratified habit (dossier §4.G). Doubles as a format proof-of-concept generalising beyond the main-track S264 record — the same 6 categories, a different track/role. Will migrate into the retro ledger as a record under {48.3}.
Session: S265 · 2026-05-25 · subo-workflow sub-orchestrator (Task ID-48 {48.1}+{48.2},
co-investigating ID-23) · worker branch cmux-worker-subo-workflow-e472c743 → af9d4e03
1. Bugs discovered
Section titled “1. Bugs discovered”- Reference-doc drift: the
empirical-groundingaxis exists intask-checker.md(L337) but is missing fromchecker-output-schema.md’s axis enum (~L52). Captured as Subtask {48.7}. session_refsformat inconsistency: the new ID-48 ref was written bare (S265) vs thekh-{track}-S{N}convention (kh-main-S264). Fixed in-session →kh-subo-workflow-S265.- Self-inflicted (workflow gotcha): a large inline
node -e '...'script with parens / pipes /${}choked zsh (parse error near )). Fix = write to a temp.cjsand run it.
2. Failed assumptions
Section titled “2. Failed assumptions”- “The validate-reality-before-spec guardrail must be built.” FALSE — it already exists
comprehensively (
task-planner.md§OQ-3 +task-checker.md§empirical-grounding). This was the meta-loop catch: the dossier framed the existing mandate as net-new work. A survey agent surfaced it; I verified it by direct read before letting it reshape scope. - “The two confirmed seeds are the same failure mode.” FALSE — ID-32 B4 (internal
contract / corpus shape) and ID-28
bind_target(external API) straddle OQ-3’s explicit internal/external scope boundary. That boundary IS the insight. - Dossier note F: “/code-review is a rename of /simplify.” FALSE — verified by reading both installed surfaces; they do different jobs.
3. Architecture / design decisions
Section titled “3. Architecture / design decisions”- Root-cause taxonomy split into Sub-type A (external-API, already covered) vs Sub-type B (internal-contract/corpus-shape, net-new) — drives the whole PLAN.
- Retro surface = 4th JSON ledger AND keep the Mempalace diary (complementary jobs).
- workflow-evaluator = agent + companion skill combo (task-executor↔implement-subtask precedent).
- Hook-1 (block agent/skill edits) = sentinel-file mechanism (PreToolUse sees tool input only, not conversation history).
- Sibling-only deps preserved; the cross-Task ID-23 sequencing was escalated as OQ-C, not bent — the forcing function worked as designed.
4. Rejected approaches
Section titled “4. Rejected approaches”- Re-authoring the empirical-verification mandate — rejected (exists).
- Mass-renaming 27 spec dirs to ID-prefix — rejected (churn; forward-only convention).
- Renaming
docs/specs/workflow-evaluation/mid-investigation — rejected (breaks the dossier/retro/task-list/PLAN cross-refs); deferred to a post-close subtask. - Editing the shared SDLC role/skill files in parallel with ID-23 — rejected (file collision); sequence-after / fold-in.
- Implementing {48.3}+ this session — rejected (OQ-gated + ID-23-gated).
5. Workflow improvements
Section titled “5. Workflow improvements”- The ID-48 programme itself (root-caused, decomposed, OQs isolated).
- Lean-context fan-out: three parallel surveys returned conclusions-only, keeping the orchestrator context small — the efficiency discipline ID-48 catalogues, applied to its own run.
- Load-bearing verification: verified the single most scope-reshaping agent conclusion (OQ-3 already exists) by direct read before acting — the exact meta-loop discipline this Task institutes.
- New gotcha for capture: inline
node -ewith special chars → temp.cjsfile.
6. Unresolved questions
Section titled “6. Unresolved questions”- The 5 in
OQ-pending.md(OQ-A retro-ledger build; OQ-B ID-prefix + rename timing; OQ-C ID-23 cross-Task sequencing; OQ-D evaluator efficiency-eval cadence; OQ-E PRODUCT-skip). - Does the parent O-of-O want a
final_report.yaml(id32-style) from this terminal, or is the worker-branch commit + this retro + OQ-pending sufficient for teardown integration?